2015-07-21 Backed Up – Main Street Red Wing, MN #roadconstruction

Backed Up – Main Street Red Wing, MN

2015-07-21 Backed Up

3 thoughts on “2015-07-21 Backed Up – Main Street Red Wing, MN #roadconstruction”

    1. It is a bit much having [almost] the whole town tore up. Resurfacing should be over shortly; then it will only be the downtown left to be complete.

  1. ” A bit much” is being far too kind for this seemingly intolerable mess. Wishing for the snow season is almost an option…….LOL

Comments are closed.